NASSCO Floats Out First BP Tanker, Holds Keel-Laying Ceremony for Second
November 19, 2003 -- SAN DIEGO, CA -- National Steel and Shipbuilding Company (NASSCO), a wholly owned subsidiary of General Dynamics (NYSE: GD), has floated out Hull 484, the first of four Alaska Class, double-hull oil tankers being built for BP Oil Shipping Company, USA. The ship will be finished dockside in preparation for delivery in June 2004.
The company also held a keel-laying ceremony for Hull 485, the second double-hull oil tanker being constructed for BP. BPs Site Team Member Steve Huddart welded his initials into the keel to signify the start of construction. The second ship is scheduled to be delivered in November 2004, with subsequent ships to be delivered in 2005 and 2006. The four ships are being constructed sequentially in NASSCOs 1,000-foot graving dock.
The design of the 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles and Cherry Point, WA.
General Dynamics, headquartered in Falls Church, Virginia, employs approximately 66,900 people worldwide and anticipates 2003 revenues of approximately $16.1 billion. The company has leading market positions in mission-critical information systems and technologies, land and amphibious combat systems, shipbuilding and marine systems, and business aviation. More information about the company can be found on the World Wide Web at www.generaldynamics.com.
© Copyright and Privacy Notice 2010 NASSCO/General Dynamics Corporation, All Rights Reserved